Monday, January 29, 2007

Sample excavation

Around times to see like the foundation of the “old” house looks remove I a small pneumatic hammer, shovel, Stemmeisen and some other tools and dig approx. a 50cm broad and 80 cm. deep hole at the house wall of the old house, I comes thereby still for a long time not to to the Kellergewölbe, but unfortunately to the end of the foundation: I.e. I must assume the submitting plans of the old Hausses are not correct and the foundation does not sit on the cellar! At the latest now the thing a stress analyst must regard: - (At the picture down one sees at the cut on the left of “corrected” foundation.
On the left of the old house, on the right of the new (planned)

Tuesday, January 9, 2007

Submitting planning

After we procured the last days all necessary documents of the municipality (a “Actionliste” to have we gotten by Romberger), to discuss were today Mr. Strübl of the building drawing office Strübl locally at property over with us submitting planning. Once he comes around the exact mass for the channel and the 0-Niveau to take still past and then he on behalf the company Romberger until next week the submitting plans will draw.Locally turned out, which the excavation goes nevertheless more deeply than I assumed (approx. 3,10m) we to build to 3 meter beside an existing old house with underlying Kellergewölbe, now must I urgently clarify whether the excavation the Gewolbe affect can.