Monday, April 9, 2007

We have the building permit and the energy document of identification

We got the building permit today! The energy document of identification was corrected and the characteristic energy value was already computed now with 27 Kwh/m2!!! : -) I angesucht this evening already on-line around housing promotion.

Energy document of identification

Today the “energy document of identification” came, the yardstick for housing promotion is. Unfortunately I had to state that the controlled dwelling ventilation was not considered. Thus a characteristic energy value of 45Kwh/m results ². Since I have the program for the computation at home, I the values directly entered and determined, that the characteristic energy value with ventilation with approx. 27Kwh/m ² to lie would have - those are 2 promotion stages (7,330 more national loans correspond)! That must be clarified now very fast with the company Romberger, otherwise we cannot to submits and our request this year no longer is treated! In addition gibt's two further ambiguity bez. the values for the windows, which constitute however max. 2Kwh/m ².

Sunday, April 8, 2007

promotion

There are only three small problems:
A) The building permit: Is already decided as per municipality since min. of one week, it must the answer be only written. There the responsible person however in the vacation was us was now promised that we have it to DO.
b) We have still no energy document of identification, get we however as per Romberger tomorrow
C) As per telephone information citizen service and as per the Website can one with a monthly pay slip submit, the specialists of the Bezikshaupmannschaft mean now however “we make that not in such a way”. We will submit nevertheless with the pay slip from May and will leave it drauf to arrive.

Saturday, April 7, 2007

Up to the excavation


Up to the excavation now only a small Pfirsichbaum and some bushes must away.

Friday, April 6, 2007

friendly farmer


Fully we brought the resulted 5 passenger car trailers to brushwood directly on Saturday to a friendly farmer, feed everything to the goats. Additionally I do not have still the any more did not need wire mesh fences at property removed and now look it already much more largely than before and we to have money saved, a tree cutter for everything together far over thousand euro would have required! (however inclusive Rausreissen and disposing of the root sticks, this work stand for us before).

Tuesday, April 3, 2007

Detailing

Yesterday and today we were busy with the detailing: Wednesday 22,6 I one day of holiday took and sanitary and dwelling ventilation (Mr. Moro, Fa. Moro) as well as electrical (Mr. Kadlec, Fa. Gindl) planned, was more arduously than I thought (in sum over 5 hours). Today (DO. 23.6.) we made the detailing with Hrn. Egger of the company Romberger inclusive structural changes, Fassadenfarbe, door stops etc. (again 3.5 hours). Now actually only sampling the windows and the Raffstores is missing.All in all planning was exerting, ran however very well and all involved ones was competent and accomodating. Now only the final plan must fit in addition we is strained also on the sum of surcharges (zus. Plug sockets/switches, zus. Raffstore, div. further little things), I hope those becomes us do not umhauen.Energy document of identification we up to now unfortunately still none needed, there we it however urgently for the submission of the housing promotion it us for next Tuesday were promised.

Sunday, April 1, 2007

The shock

For the venture of the old foundation building master Scheidl from that was recommended to me 22 district. Also equivalent there it was and the thing regarded. In the meantime point I that the venture will additionally load my budget with approx. 10.000€! Shock! I have naturally try alternatives to find, but special methods such as concrete injections or sheet pile walls do not disburse themselves for a so small building site and would be many more expensive, in addition many building masters have no interest in so a delicate and relatively small order. Here deutich the disadvantage of prefabricated building companies shows up, even if they are not general contractors cannot them to one for unexpected problems as this to be helped them the people for it to have there. Who builds with a building master is here clearly in the advantage, which however to be called is not which we our resolution with Romberger to build to repent.