Thursday, May 3, 2007
Day guard!
Today punctually 6:30 stood the boss (Mr. Blaha) personally as excavator drivers and two trucks before the door. To short discussion went loosely, until in the evening the gesammte excavation was settled and the majority of the crushed stone tumbling was already aufgeracht: -)
Unfortunately too little place for the storage of the excavation is, alone with the surface soil was the whole storage space fully thus had only everything to be removed and later must again material to the Hinterfüllen and Anschütten be brought at property: - (